A basement door is concealed; the new Cararra marble island top is spotlighted; a PVC fence is installed on top of the retaining wall; the front steps are given new life with a grinder, a router, epoxy and non-slip exterior paint; and the salvaged marble mantel and surround are installed in the sitting room. Also: the transformation of a Boston lighthouses into a summer home.